WETEX 2026 Puts Water Security at the Centre covers the Water Platform, desalination and smart networks.
Every great city is built on water. At WETEX 2026, Dubai has given that conversation its own dedicated platform, bringing the world’s leading water technologies to Dubai World Trade Centre from 20 to 22 October.
The 28th Water, Energy, Technology and Environment Exhibition presents the latest in water production, desalination, wastewater treatment and reuse, alongside smart networks, leak detection technologies and advanced resource management systems.
A Dedicated Water Platform
The Water Platform at WETEX 2026 gives organisations, experts and specialists from around the world a focused space to exchange knowledge, explore innovative solutions and strengthen cooperation between the public and private sectors.
Allocating a dedicated platform to water underscores the strategic importance of the sector and its pivotal role in achieving water security and supporting the UN Sustainable Development Goals 2030.
Those are the words of HE Saeed Mohammed Al Tayer, MD and CEO of DEWA and Founder and Chairman of WETEX. The guiding idea is an integrated approach: diversify water sources, improve efficiency, invest in lower-energy desalination, expand reuse and strengthen network resilience.
Desalination Powered by Cleaner Energy
Advances in reverse osmosis technology, high-efficiency membranes and pumps, together with growing use of clean energy, are reshaping desalination. Seawater reverse osmosis generally uses less energy than multi-stage flash distillation.
DEWA’s Hassyan Seawater Reverse Osmosis Desalination Plant, with a planned capacity of 180 million imperial gallons per day (MIGD), is among the world’s largest SWRO projects. By 2030, DEWA aims to produce 100% of its desalinated water using clean energy and waste heat.
Across the wider UAE, Emirates Water and Electricity Company (EWEC), a Strategic Sponsor of WETEX 2026, plans to raise the share of low-carbon reverse-osmosis desalination to 92% of water production by 2030.
Wastewater Becomes a Renewable Resource
Water reuse is emerging as one of the most promising sources of supply. The World Bank estimates that municipal and industrial water reuse could grow eightfold worldwide by 2040, reaching 430 million cubic metres per day, a dependable source that stays steady through changing climates.
Smart Networks Deliver Every Drop
Network management is moving toward real-time monitoring and proactive control, supported by sensors, smart meters, hydraulic modelling and remote-control systems.
DEWA’s technologies have lifted network efficiency from 57.5% in 1989 to 95.6% in 2025, a gain of 38 percentage points over three and a half decades. Its Hydro Insight system applies artificial intelligence to turn data into actionable insight, improving response times, service quality and network readiness in line with the highest international standards.
The Companies Behind the Pipes, Pumps and Plants
WETEX 2026 brings the full water value chain to one venue.
- Thermax presents advanced water and wastewater treatment, desalination, water reuse and zero liquid discharge solutions.
- Embosal brings locally manufactured steel pipelines for water transmission across the UAE and GCC.
- Gulf Eternit Industries showcases sustainable composite pipes and fittings made in the UAE.
- Torishima Service Solutions and Trillium Flow Technologies focus on pump engineering, lifecycle support and operational reliability.
- Siemens, Schneider Electric, SAP and Dell Technologies supply the digital and AI layer that makes modern utilities intelligent.
Showcasing water, utility or infrastructure technology? AURA 919 designs and builds exhibition stands, LED and digital installations, AV and lighting for utilities and sustainability brands across Dubai, Riyadh and Doha. Concept and quote within 24 hours.
Book a 30 Minute CallMaking Water Technology Visible
Water technology works quietly. Membranes, valves and sensors do their best work out of sight, which makes the exhibition stand an essential storyteller. The most memorable exhibitors translate invisible engineering into visible experience.
- A flowing LED wall that follows a drop from sea to tap.
- An interactive digital twin of a network that visitors can explore.
- A scale model that makes a plant or pipeline easy to understand in seconds.
- Clear graphics that put one headline figure in front of every visitor.
That is where AURA 919 adds value, helping complex solutions meet decision-makers with clarity. See how we approach infrastructure and government briefs in our portfolio.
Ready to plan your next stand? Browse our portfolio, send a brief through our contact page, or write to info@aura919.com. Our team responds within 24 hours.
Practical Details
The 28th WETEX runs from 20 to 22 October 2026 at Dubai World Trade Centre, Sheikh Zayed Road, Dubai. It is organised by Dubai Electricity and Water Authority (DEWA) under the directives of HH Sheikh Mohammed bin Rashid Al Maktoum and the patronage of HH Sheikh Ahmed bin Saeed Al Maktoum. Visitor registration and exhibitor information are available on the official WETEX website.
If Dubai World Trade Centre is on your calendar for any show, our GCC exhibition calendar covers the full season, and our exhibition stand builder Dubai page sets out process, timelines and indicative costs.
Official WETEX 2026 Resources
For the full exhibitor directory, floor plan and session schedule, the organisers publish the WETEX 2026 exhibition catalogue, the event programme and the floor plan. Follow the exhibition on LinkedIn, Instagram, Facebook and X for live updates.
- WETEX 2026: 3,000 Companies, One Dubai Stage
- Green Mobility at WETEX 2026: Dubai Drives Ahead
- Arabian Travel Market 2026, Dubai World Trade Centre
- GITEX Global 2026 Exhibition Stand Guide
- WETEX 2026 Exhibition Stand Guide
- Exhibition Stands in Saudi Arabia 2026, LEAP and Big 5
- Exhibition stand design, LED and digital installations, event production and AV
- Portfolio, government and destination projects across the GCC
FAQ
Water security at WETEX 2026, the practical details.
What is the Water Platform at WETEX 2026?
The Water Platform at WETEX 2026 is a dedicated space that brings together leading organisations, companies, experts and specialists from around the world to showcase the latest water innovations, technologies and smart solutions, and to strengthen cooperation between the public and private sectors. WETEX 2026 runs from 20 to 22 October 2026 at Dubai World Trade Centre.
What is DEWA’s Hassyan Seawater Reverse Osmosis Desalination Plant?
DEWA’s Hassyan Seawater Reverse Osmosis (SWRO) Desalination Plant has a planned production capacity of 180 million imperial gallons per day (MIGD), making it one of the world’s largest SWRO projects. By 2030, DEWA aims to produce 100% of its desalinated water using a combination of clean energy and waste heat.
How efficient is Dubai’s water network?
DEWA’s advanced technologies and systems have lifted network efficiency from 57.5% in 1989 to about 95.6% in 2025, based on DEWA’s reported transmission and distribution figures. DEWA’s Hydro Insight system applies artificial intelligence to turn data into actionable insights and improve response times and service quality.
Why is water reuse important?
The World Bank estimates that municipal and industrial water reuse could increase eightfold worldwide by 2040, reaching 430 million cubic metres per day. Reuse provides a dependable water source that stays steady through changing climate conditions and eases pressure on conventional supplies.
What is the UAE’s plan for low-carbon desalination?
Emirates Water and Electricity Company (EWEC), a Strategic Sponsor of WETEX 2026, plans to increase the share of low-carbon reverse-osmosis desalination to 92% of water production by 2030, alongside utility-scale solar capacity of more than 15 GW by 2030 and more than 35 GW by 2035.
Who designs and builds exhibition stands for water and utility companies in Dubai?
AURA 919 is a Dubai-based exhibition stand builder and event production company operating across the UAE, Saudi Arabia and Qatar since 2009. The company designs and builds custom stands, LED and digital installations, AV and lighting for utilities, infrastructure and sustainability brands at Dubai World Trade Centre, Expo City Dubai, ADNEC Abu Dhabi and RICEC Riyadh.